NEW QUESTION # 33
Define Right of way ROW

  • A. Is the area where the ground disturbance occurs within 50 feet of the centerline of the existing facility or within the existing facilities ROW or easement, whichever is greater. Additional distance may be required for the constructions such as topography side-hill lays, catholic operating equipment, and topography.
  • B. Is the construction of a new natural gas pipeline facility by Crossing company that will cross owners existing natural gas pipeline(s). The extent of the crossing area is established by the beginning and ending of the encroachment area. Crossing construction begins with the first disturbance of soil in the encroachment area and ends when the ROW has been restored.
  • C. Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.
  • D. Is the property in which a pipeline company and a landowner both have legal interest. The ROW is usually established through a written document known as an easement. The easement provides that each entity has the right to be there although each is permitted different uses of the land. Pipeline companies are typically granted permission to install operate and maintain a buried pipeline and sometimes, with surface apparatuses across a certain portion of land without interference with its rights to do so.

Answer: D


NEW QUESTION # 34
Removal and disposal of brush, undergrowth and timber

  • A. Purging
  • B. Erasing
  • C. Clearing
  • D. Grading

Answer: D


NEW QUESTION # 35
Define quality plan in terms related to Data, information and document.

  • A. Specification of the procedures and associated resources to be applied when and by whom to a specified object.(these procedures generally include those referring to quality management processes and the product and services realization processes)(ISO 9000 3.8.9)
  • B. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)
  • C. Process of establishing, documenting, implementing, maintaining and continually improving a quality management system.(ISO 9000 3.4.3)
  • D. Part of quality management focussed on providing confidence that quality requirements will be fulfilled.(ISO 9000 3.3.6)

Answer: A


NEW QUESTION # 36
During pressure testing, what must the testing supervisor review with test inspector, chief, and other personnel to be certain that all equipment is adequate?

  • A. Materials and Material Handling
  • B. Design validation
  • C. Strength pressure test
  • D. Test Specs and procedures

Answer: D


NEW QUESTION # 37
Transportation, installation or repair of pipe shall not reduce the wall thickness at any point to a thickness of less than________ of original

  • A. 80%
  • B. 100%
  • C. 50%
  • D. 90%

Answer: D


NEW QUESTION # 38
SWP3

  • A. Reclaimed Water
  • B. Storm Water Pollution Plan
  • C. Strategic Plan
  • D. Federal Water Pollution And Control Act

Answer: B


NEW QUESTION # 39
What are some examples of loss prevention systems that the inspector should be familiar with?

  • A. Within 24 hours of each 0.50 inch of rainfall(FERC Upland 11.B.13)
  • B. Strength, spike, and leak(API 1110 4.1.7)
  • C. Data supporting the existence of verity of something(Objective evidence can be obtained through observation measurement test or by other means)(ISO 9000 3.8.3)
  • D. Lifting/hoisting pipe and equipment, excavation your pipe lines or other utilities, marking/labeling, and other programs to increase awareness

Answer: A


NEW QUESTION # 40
Cathodic protection test stations are typically installed every?

  • A. rework(api 1104 3.1.25)
  • B. 2 to 3 kilometres(CEPA 16.1)
  • C. 12 inches(api 1169 7.15)
  • D. 98 to 3 kilometres(cepa 16.1)

Answer: B


NEW QUESTION # 41
A shovel must be used to remove dirt within _______ rather than mechanical equipment.

  • A. 3192.233
  • B. 0
  • C. 1
  • D. 2

Answer: B


NEW QUESTION # 42
BMP

  • A. Ada Standards For Recapture Devices
  • B. Leak Response Plan
  • C. Best Management Practices
  • D. Epa Air Quality Standards

Answer: B


NEW QUESTION # 43
Which pressure test is designed to establish the operating pressure limit of a pipe?
-Strength pressure
-Hydrostatic pressure
-Spike pressure
-Leak pressure

  • A. Test specs and procedures
  • B. A pressure just above test pressure
  • C. Grading
  • D. Strength pressure test

Answer: A


NEW QUESTION # 44
Crossing angle

  • A. Gouges, buckles, wrinkles, ripples or ovality,s
  • B. As close to perpendicular as possible
  • C. Grubbing (not allowed in wet lands)
  • D. Grading

Answer: B


NEW QUESTION # 45
A quality management system/policy for all products and servicing shall measure the ___________ and improve upon the system.

  • A. efficiency
  • B. quality control
  • C. effectiveness
  • D. productivity

Answer: C


NEW QUESTION # 46
Due diligence corridor is ____ from centerline

  • A. 50 ft
  • B. 100 ft
  • C. 45 ft
  • D. 25 ft

Answer: A


NEW QUESTION # 47
Pressure required for soil to fail under compression

  • A. Wetland
  • B. Unconfined compressive state
  • C. Pressure testing
  • D. Quality improvement

Answer: C


NEW QUESTION # 48
On pipe _______ inches or larger in diameter, a wrinkle bend may not have a deflection of more than _______ degrees per wrinkle.
Standard and Section?

  • A. 1 & 2
  • B. 3192.233
  • C. 16 / 1.549 CFR 192.315
  • D. 72/smys

Answer: C


NEW QUESTION # 49
Class _____ explosives - Includes certain types of manufactured articles which contain Class A or Class B explosives or both as components but in restricted quantities.

  • A. Cannot
  • B. C
  • C. weight of the pipe including components
  • D. Permit

Answer: B


NEW QUESTION # 50
Excavation where width is greater than depth.

  • A. The System Power Source
  • B. Trench
  • C. Peak
  • D. Mid-ocean Ridge

Answer: B


NEW QUESTION # 51
MUTCD

  • A. Spill Prevention Control and Containment
  • B. Maximum operating pressure
  • C. Material transfer form
  • D. Manual of Uniform Traffic Devices

Answer: D


NEW QUESTION # 52
Color used for surveyed communication, alarm, signal, cables or conduits

  • A. Yellow
  • B. White
  • C. Orange
  • D. Green

Answer: C


NEW QUESTION # 53
......