C-TS422-2021 Exam Dumps, C-TS422-2021 Practice Test Questions [Q27-Q52]

Share

C-TS422-2021 Exam Dumps, C-TS422-2021 Practice Test Questions

PDF (New 2022) Actual SAP C-TS422-2021 Exam Questions

NEW QUESTION 27
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the material staging report.
  • B. Use batch determination.
  • C. Use the material where-used report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 28
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The lot size range must be within the lot-size range of the assigned routing.
  • B. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The assigned routing must be a rate routing.
  • E. The assigned routing must NOT have alternative sequences.

Answer: A,B,C

 

NEW QUESTION 29
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a negative lanning horizon in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

Answer: A

 

NEW QUESTION 30
What is the difference between co-products and by-products?

  • A. Only co-products are identified by a special item category in the bill of material (BOM).
  • B. Only by-products have a zero inventory valuation.
  • C. Only co-products appear in the process or production order settlement rule.
  • D. Only co-products can be manufactured in isolation from the main product.

Answer: C

 

NEW QUESTION 31
You want to create a production order from a planned order. What methods could you use?

  • A. Partial conversion
  • B. Combined conversion
  • C. Order release
  • D. Collective conversion

Answer: A,D

 

NEW QUESTION 32
How can you limit the validity of a bill of material (BOM)?

  • A. By plant
  • B. By industry
  • C. By material type
  • D. By period

Answer: A,D

 

NEW QUESTION 33
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Rate routing
  • C. Replenishment strategy
  • D. Production supply area

Answer: A

 

NEW QUESTION 34
How can you carry out cost object controlling for production orders?

  • A. Cost-related
  • B. Milestone-related
  • C. Product-related
  • D. Order-related

Answer: C,D

 

NEW QUESTION 35
What does forecasting in demand planning cycle include?

  • A. One-off events
  • B. Past sales order quantites
  • C. Past quotation quantities
  • D. Market intelligence
  • E. Past procurment quantities

Answer: A,B,D

 

NEW QUESTION 36
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a seperate resource in the production data structure.
  • B. Model a resource inbound in the location master.
  • C. Model a transportation resorce in the location master.
  • D. Model a handling resource in the location master and goods receipt time in the material master.

Answer: C,D

 

NEW QUESTION 37
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Planning without final assembly (50)
  • C. Make-to-stock production (10)
  • D. Make-to-order production (20)

Answer: A

 

NEW QUESTION 38
Which of the following questions do you have to answer before you start creating a BOM?

  • A. What status does the BOM have?
  • B. Is the material type allowed in the BOM?
  • C. Which Valid To information is necessary?
  • D. In which storage location is the BOM required?

Answer: B,C

 

NEW QUESTION 39
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • D. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.

Answer: C

 

NEW QUESTION 40
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Planned order or material number
  • B. Valid period or sale order
  • C. Lot size or material cost
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 41
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The last restrictive status
  • B. The cross-plant status
  • C. The plant-specific status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 42
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Integrated Business Planning (IBP)
  • B. Capacity Requirements Planning (CRP)
  • C. Supply Chain Management(SCM)
  • D. Material Requirements Planning (MRP)

Answer: A,C

 

NEW QUESTION 43
Which chart types does the tabular planning table provide in SAP S/4HANA

  • A. Order (pool) chart
  • B. Capacity requirements chart
  • C. Order (dispatched) chart
  • D. Work center capacities chart

Answer: B,D

 

NEW QUESTION 44
Which of the following processes lead to an entry in the MRP planing file?

  • A. Creation of purchasing contract
  • B. Creation of sales order
  • C. Change of the storage bin
  • D. Change of the material's procurement type
  • E. Creation of dependent requirements

Answer: B,D,E

 

NEW QUESTION 45
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. By usage probability
  • B. 100% check
  • C. Simultaneous
  • D. First in first out (FIFO)

Answer: A,B

 

NEW QUESTION 46
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • B. MRP creates capacity requirements without checking the capacity of a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements only if the work center has sufficient capacity.

Answer: B

 

NEW QUESTION 47
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you deliver a sales order
  • B. When the MRP result are saved
  • C. When you create a planned order
  • D. When you create a sales order

Answer: D

 

NEW QUESTION 48
Which item statuses can you select inside a material BOM?

  • A. Engineering
  • B. Quality management
  • C. Service
  • D. Sales

Answer: A,D

 

NEW QUESTION 49
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. The Relevant for Finite Scheduling indicator must be set
  • B. An overall profile must be assigned in the checking control.
  • C. A checking rule must be assigned in the checking control
  • D. The PRT Availability Check must be set in the checking control.

Answer: A,B

 

NEW QUESTION 50
Which time elements are relevant for lead time scheduling of a production order?

  • A. Float after production
  • B. Total replenishment lead time
  • C. Setup time
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 51
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use specific MRP controller
  • B. Use a specific material group
  • C. Use a specific MRP type
  • D. Use a specific material status

Answer: A,B

 

NEW QUESTION 52
......

Updated Sep-2022 Pass C-TS422-2021 Exam - Real Practice Test Questions: https://www.preppdf.com/SAP/C-TS422-2021-prepaway-exam-dumps.html

Dumps Moneyack Guarantee - C-TS422-2021 Dumps UpTo 90% Off: https://drive.google.com/open?id=1FRN84VvzO4E_wjV__WmKForSFix5TkuY