[Dec-2021] Latest C-TSCM42-67 Exam Dumps for Pass Guaranteed
Reliable SAP Certified Application Associate C-TSCM42-67 Dumps PDF Dec 16, 2021 Recently Updated Questions
SAP PP Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Process Orders (PP-PI) | Identify specific properties of process orders. SCM300, SCM130 OR TSCM40, TSCM42 | < 8% |
| Material Requirements Planning (PP-MRP) | Explore material requirements planning functions. SCM240 OR TSCM40, TSCM42 | > 12% |
| Master Data (LDM) | Set up master data for production planning and manufacturing. PLM114 OR TSCM40, TSCM42 | 8% - 12% |
| Lean Manufacturing (PP-REM, PP-KAB) | Outline the highlights of repetitive manufacturing and kanban. SCM300, SCM130 OR TSCM40, TSCM42 | 8% - 12% |
| Basics on SAP Business Processes (E-Learnings) | Outline the scope of SAP SCM business processes. TERP01, TERP50 OR TSCM40, TSCM42 | < 8% |
NEW QUESTION 46
What can you use to organize material staging for production orders? (Choose three)
- A. Transfer orders
- B. Material documents
- C. Pull list
- D. Logistics Information System (LIS)
- E. KANBAN
Answer: A,C,E
NEW QUESTION 47
Which of the following elements can be used in a process order? (Choose three)
- A. Process instructions
- B. Parallel sequences
- C. Suboperations
- D. Relationships
- E. Phases
Answer: A,D,E
NEW QUESTION 48
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
- A. Planning at the assembly level (strategy 70)
- B. Planning with make-to-stock (strategy 10)
- C. Planning with final assembly (strategy 40)
- D. Planning without final assembly (strategy 50)
Answer: D
NEW QUESTION 49
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).
What could be the reason?
- A. The repetitive manufacturing indicator has been set.
- B. There is no valid production version for this material.
- C. There are no planned orders or production orders present.
- D. There are no requirements present.
Answer: B
NEW QUESTION 50
What are characteristics of repetitive manufacturing? (Choose three)
- A. Continuous material consumption, production flow and output
- B. Production without using production orders and without status management
- C. Period-based planning of the quantities to be produced
- D. Automatic line loading based on capacity limits across all production lines
- E. Shop fabrication
Answer: A,B,C
NEW QUESTION 51
What functions can you use for sub operations? (Choose two)
- A. Production/Resource tools allocation
- B. Material component allocation
- C. Costing
- D. Capacity planning
Answer: C,D
NEW QUESTION 52
Which option for selecting a routing exists when you create a production order?
- A. Automatic selection based on the selection ID in the material master
- B. Automatic selection of a reference operation set
- C. Manual selection based on the list of routings maintained in the material master
- D. Manual selection based on settings in the order type-dependent parameters
Answer: D
NEW QUESTION 53
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.
What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
- A. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
- B. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
- C. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
- D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
Answer: B
NEW QUESTION 54
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)
- A. Propose a standard text key in work center.
- B. Enter formulas for costing in the work center.
- C. Assign a production scheduling profile to the material master (product).
- D. Use an operation control key with the indicator costing-relevant.
- E. Assign costing variants to order type.
Answer: B,D,E
NEW QUESTION 55
Which activity can trigger an automatic availability check for the components of a production order?
- A. Order rescheduling
- B. Goods receipt for a missing part
- C. Material staging
- D. Order release
Answer: D
NEW QUESTION 56
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?
- A. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.
- B. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.
- C. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.
- D. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.
Answer: B
NEW QUESTION 57
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
- A. Standard value from operation in task list
- B. User-defined field from operation in task list
- C. General values from work scheduling view in the material master
- D. General item values in bill of materials
- E. General operation values in task list
Answer: A,B,E
NEW QUESTION 58
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
- A. Standard values in the operations of routings
- B. General item values of bill of materials
- C. User-defined fields in the operation of routings
- D. General operation values of routings
- E. General values from work scheduling view of the material master
Answer: A,C,D
NEW QUESTION 59
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
- A. By the firming mechanism with the longer firming interval
- B. By the manual firming date
- C. It is predefined in Customizing.
- D. By the planning time fence from the material master
Answer: A
NEW QUESTION 60
What do you have to consider regarding consumption? (Choose two)
- A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
- B. Consumption is restructured with the planning run.
- C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Answer: A,D
NEW QUESTION 61
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
- A. Resource selection
- B. Approved master recipes
- C. Availability check
- D. Electronic batch record
- E. Digital signature
Answer: B,D,E
NEW QUESTION 62
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.
Which sequence category do you use to create the second sequence in the system?
- A. Finish-start relationship
- B. Alternative sequence
- C. Standard sequence
- D. Parallel sequence
Answer: B
NEW QUESTION 63
......