NEW QUESTION 32
Which of the following functions does SAP Supply Chain Management (SCM) offer?
- A. Optimization of the procurement strategy with the supplier pool
- B. Planning of supply chains across company boundaries
- C. Product development, safety, quality, and maintenance
- D. Communication with customers through different interaction channels
Answer: B
NEW QUESTION 33
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. Subcontracting is supported by MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. An MRP area may include different storage locations.
- D. A storage location may be assigned to different MRP areas.
Answer: A,C
NEW QUESTION 34
What is SAP Solution Manager?
- A. An add-on industry solution
- B. A managed system in a system landscape
- C. A transaction in the SAP ECC system
- D. A standalone system that communicates with other systems in a system landscape
Answer: D
NEW QUESTION 35
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
- A. Rate routing
- B. Control cycle
- C. Product cost collector
- D. Production supply area
- E. Production version
Answer: B,D
NEW QUESTION 36
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
- A. It posts planning results to the database automatically.
- B. It calculates the delay time which may occur in planning.
- C. It triggers multilevel bottom-up scheduling.
- D. It propagates exception messages from a component to the finished product.
Answer: B
NEW QUESTION 37
Which of the following statements about consumption are correct? (Choose two)
- A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
- B. Consumption is restructured with the planning run.
- C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Answer: A,D
NEW QUESTION 38
What could be a consequence of confirming an operation?
- A. The capacity requirements are updated
- B. The production order is rescheduled
- C. The planned costs are updated
- D. The actual costs are settled
Answer: A
NEW QUESTION 39
In which of the following objects can you activate back flushing for production orders? (Choose three)
- A. Work center
- B. Routing
- C. Material master (finished product)
- D. Production scheduling profile
- E. Material master (component)
Answer: A,B,E
NEW QUESTION 40
For which of the following objects can you enter a confirmation? (Choose two)
- A. Production order operation
- B. Production order
- C. Work Center
- D. Trigger Point
Answer: A,B
NEW QUESTION 41
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- A. A planning scenario must be released to use it in long-term planning.
- B. Reorder point planned materials can be included in long-term planning.
- C. In case of external procurement, long-term planning creates purchase requisitions.
- D. Long-term planning generally is operational planning of important components.
Answer: A,B
NEW QUESTION 42
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
- A. Creation of the production order
- B. Confirmation of the operation that the materials being checked are assigned to
- C. Release of the production order
- D. Goods receipt for a missing part
- E. Goods receipt for the product produced with the order
Answer: A,C
NEW QUESTION 43
Where can you define the valid receivers for production order costs?
- A. In the costing variant
- B. In the valuation variant
- C. In the settlement profile
- D. In the production scheduling profile
Answer: C
NEW QUESTION 44
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
- A. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
- B. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
- C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- D. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.
Answer: B,D
NEW QUESTION 45
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. A planning algorithm from capacity planning
- B. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
- C. Manual assignment of planned production quantities in a planning table
- D. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- E. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
Answer: C,D,E
NEW QUESTION 46
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Substitute sequence
- B. Alternative sequence
- C. Standard sequence
- D. Parallel sequence
Answer: B
NEW QUESTION 47
You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use?
- A. NLAG (non-stock material)
- B. FERT (finished product)
- C. HAWA (trading good)
- D. ROH (raw material)
Answer: D
NEW QUESTION 48
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
- A. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
- B. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
- C. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
- D. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
Answer: A
NEW QUESTION 49
You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?
- A. The production order has been released.
- B. Order papers have been printed.
- C. The material availability check has been performed.
- D. Goods movements have been posted.
Answer: D
NEW QUESTION 50
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. Requirements planning has not been carried out.
- B. The delta between the availability dates falls within the tolerance window defined in Customizing.
- C. The MRP elements are linked via fixed pegging.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: B,D
NEW QUESTION 51
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
- A. At the plant level
- B. At the business area level
- C. At the client level
- D. At the company code level
Answer: A,C
NEW QUESTION 52
In which master data object do you set the standard values for an operation?
- A. Production Resource/Tool (PRT)
- B. Material Master
- C. Routing
- D. Work Center
Answer: C
NEW QUESTION 53
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)
- A. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
- B. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
- C. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
- D. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
Answer: C,D
NEW QUESTION 54
What sequence do you follow in master data maintenance to define the production of a material?
- A. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
- B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
- C. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
- D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Answer: D
NEW QUESTION 55
......